Steel Structure Installation

STEEL STRUCTURE INSTALLATION

[/ vc_column_text] [/ vc_column] [/ vc_row]

All preparations to be made in the construction site are completed before the finished material is transferred to the construction site. The anchor plates are anchored under the supervision of the topographers before and after the reinforced concrete, and then the structural steel is transferred to the construction site.

Stock is made in places determined by the construction site management. The installation is started by taking the necessary security measures at the highest level in the construction site installation site. [/ Vc_column_text]

[/ vc_column] [/ vc_row]

ADVANTAGES OF STEEL CONSTRUCTION

[/ vc_column_text]

  • Steel is the material with the highest ratio of carrying capacity to weight. Since the elastic modulus of steel is much higher than other materials, the strength of steel structure elements is high and its volume is small. The smaller dimensions compared to wood and concrete cause more usage area, less material usage and thus less cost and pollution.
  • Since steel is a ductile material compared to reinforced concrete, it absorbs the energy falling on it without damaging it, and does not lose its bearing capabilities and sensitivity. Correctly designed steel structure and carrier systems have high resistance to both normal and temporary loads (wind, earthquake, etc.).
  • It takes less earthquake load due to its lightness. It is the most accurate construction material for all ground classes and earthquake zones, including weak grounds with low bearing capacity.
  • It does not limit the height of the structure as it has a high flexibility.
  • Steel construction elements are industrial pre-production, and they are produced and documented according to the specifications specified in international standards. Since the measurement tolerances are in the order of mm, the assembly is done without any problems, it is suitable for practical calculation. Since it does not require repairs on the construction site, it significantly shortens the construction period.
  • By increasing the percentage of production in the workshop, both the work time in the field is shortened and higher quality production is made due to the more qualified workshop manufacturing.
  • Since it is not hidden in concrete, its compliance with the project and standards can be inspected at any time.
  • Steel construction structures have the ability to pass wide openings in industrial buildings without columns and occasionally without a carrier. This allows the cost reduction and the building to be used more aesthetically.
  • With the bolt-nut connection method, the disadvantages of the welded assembly are eliminated; Thanks to its easy disassembly feature, material loss is prevented with minimum loss in disassembling, moving, changing, enlarging or reducing the steel construction structure and can be transported easily and economically to the desired point.
  • Industrial buildings undergo frequent revisions due to reasons such as capacity increase and equipment change. Providing architectural design freedom and long-lasting, flexible use, steel structures provide an easy, fast, trouble-free and economical modification opportunity in operations such as replacement, renewal, enlargement / reduction, addition / removal, repair and strengthening.

[/ vc_column_text] [/ vc_column] [/ vc_row]